Opal Tower
Opal Tower at Sydney Olympic Park, Australia Towers D
Building
Completed, 2018
2127
residential
concrete
117.0 m / 384 ft
36
3
392
515
4
41,811 m² / 450,050 ft²
Proposed
Construction Start
Completed
Retrofit Start
Retrofit End
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The CTBUH lists a project manager when a specific firm has been commissioned to oversee this aspect of a tall building’s design/construction. When the project management efforts are handled by the developer, main contract, or architect, this field will be omitted.
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
The Engineer of Record takes the balance of the engineering effort not executed by the “Design Engineer,” typically responsible for construction documents, conforming to local codes, etc.
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
30 October 2017
Shaping Australia’s Tall Tower Design And High Livability Standards
Guy Lake, Katie Rathbone, Philip Vivian & Kristen Whittle, Bates Smart
With nearly 90% of its population expected to live in its state-capital cities by 2053, Australia is on track to become one of the world’s...
19 December 2019
Residents Return to Sydney Tower After Extensive Repairs
Opal Tower builder Icon has cleared residents to return to the Sydney apartment building, which was evacuated 12 months ago after cracking was discovered in...
19 December 2019
Residents Return to Sydney Tower After Extensive Repairs
Opal Tower builder Icon has cleared residents to return to the Sydney apartment building, which was evacuated 12 months ago after cracking was discovered in...
29 August 2019
Sydney Tower’s “Provision for Defect” Fund Falls Short
Since the evacuation of Opal Tower at Sydney’s Olympic Park, Construction giant ICON claims it has spent AU$24 million (US$16.2 million), despite putting only AU$1...
01 March 2019
Report on Sydney’s Opal Tower Blames Structural Design, Construction Flaws for Cracks
The Opal Tower final report, made public on March 1, 2019 after a two-month investigation, found that critical hob beams in the residential tower were...
02 January 2019
Residents in 36-Story Sydney Tower Evacuated, Remain Stranded
The developer of a Sydney high-rise building which had to be evacuated on Christmas Eve says it has been “stunned” by structural defects which have...
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy