You must be a CTBUH Member to view this resource.
Parque Central Torre Officinas I
Parque Central Torre Oeste
Building
Completed, 1979
office
concrete
225.0 m / 738 ft
56
26
You must be a CTBUH Member to view this resource.
You must be a CTBUH Member to view this resource.
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
CTBUH Releases Analysis of Global Population and Tall Buildings
13 April 2011 - CTBUH Journal
13 April 2011
Tall and Urban: An Analysis of Global Population and Tall Buildings
CTBUH Research
Tall buildings are spreading across the globe at an ever-increasing rate. This study demonstrates the relationship between population and tall buildings across those countries and...
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy