You must be a CTBUH Member to view this resource.
Petronas Tower 3
Menara Carigali Tower, Grant 43699, Lot 171, Seksyen 58
Building
Completed, 2012
office
concrete
267.0 m / 876 ft
60
5
250
28
8 m/s
141,300 m² / 1,520,941 ft²
You must be a CTBUH Member to view this resource.
You must be a CTBUH Member to view this resource.
Proposed
Construction Start
Completed
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
These are firms that consult on the design of a building's façade. May often be referred to as "Cladding," "Envelope," "Exterior Wall," or "Curtain Wall" Consultant, however, for consistency CTBUH uses the term "Façade Consultant" exclusively.
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Usually takes on the balance of the architectural effort not executed by the "Design Architect," typically responsible for the construction documents, conforming to local codes, etc. May often be referred to as "Executive," "Associate," or "Local" Architect, however, for consistency CTBUH uses the term "Architect of Record" exclusively.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The CTBUH lists a project manager when a specific firm has been commissioned to oversee this aspect of a tall building’s design/construction. When the project management efforts are handled by the developer, main contract, or architect, this field will be omitted.
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
These are firms that consult on the design of a building's façade. May often be referred to as "Cladding," "Envelope," "Exterior Wall," or "Curtain Wall" Consultant, however, for consistency CTBUH uses the term "Façade Consultant" exclusively.
CTBUH Releases Year in Review: Tall Trends of 2012
31 December 2012 - CTBUH Journal
19 September 2012 | Kuala Lumpur
Computational Fluid Dynamics in the Design of High-Rise Structures
Proposed projects typically undergo multiple rounds of design iterations and significant massing alterations. As the project morphs, wind loads will change and structural design may...
31 December 2012
Year in Review: Tall Trends of 2012
Kevin Brass, Antony Wood & Marty Carver, CTBUH
For the first time in six years the number of tall buildings completed annually around the world declined as the effects of the global financial...
Sited on the southwest corner of the Kuala Lumpur City Centre Development (KLCC), Menara Carigali is directly adjacent to the Petronas Towers, designed by the same architect. This new office tower supports the whole complex without detracting from the renowned twin towers. Like the Petronas Towers, whose form is generated by two interlocking squares, the new tower’s form is generated by two interlocking volumes: a square and a triangle.
The design of the building envelope carefully responds to the tropical climate of Malaysia. To control heat gain and glare in the offices, the total area of vision glass is limited. The unitized curtain wall system is composed of alternating rows of tinted glass, back-painted glass, and aluminum-finished composite panels. Rounded anodized aluminum mullions add texture and perforated brise-soleil, also of anodized aluminum, provide shade. At the ground level, the storefront is more transparent, incorporating fritted and vision glass.
31 December 2012
Year in Review: Tall Trends of 2012
For the first time in six years the number of tall buildings completed annually around the world declined as the effects of the global financial...
01 February 2010
Structural Design of Reinforced Concrete Tall Buildings
During the last 12 years the Structural Engineering Department at Dar Al-Handasah has designed 45 mixed-use tall buildings in different Arab countries. The designed towers...
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy