You must be a CTBUH Member to view this resource.
Place Ville Marie
Building
Completed, 1962
H3B 4A7
office
steel
188.0 m / 617 ft
43
32
95,922 m² / 1,032,496 ft²
You must be a CTBUH Member to view this resource.
You must be a CTBUH Member to view this resource.
Construction Start
Completed
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Usually takes on the balance of the architectural effort not executed by the "Design Architect," typically responsible for the construction documents, conforming to local codes, etc. May often be referred to as "Executive," "Associate," or "Local" Architect, however, for consistency CTBUH uses the term "Architect of Record" exclusively.
Warm Weather Spaces Walking Tours 2015
17 September 2015 - Event
07 November 2013 | Montreal
Lynn S. Beedle Lifetime Achievement Award: A Lifetime's Work
Lynn S. Beedle Lifetime Achievement Awardee Henry Cobb's career is remarkable because of his ethical and forward-thinking approach to the design of tall buildings and...
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy