You must be a CTBUH Member to view this resource.
Plaza 10
Plaza 10 at Harborside Financial Center, Harborside Plaza 10
Building
Completed, 2002
07302
office
steel
82.0 m / 269 ft
19
55,277 m² / 594,997 ft²
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy