Filter by
Note: As this project is architecturally topped out, the data is based on the most reliable information currently available. This data is thus subject to change until the building has completed and all information can be confirmed and ratified by the CTBUH.
You must be a CTBUH Member to view this resource.
PwC Tower
Il Curvo, Torre Libeskind, Il Curvo - Libeskind Tower
Building
Architecturally Topped Out
20145
office
steel/concrete
175.5 m / 576 ft
34
Proposed
Construction Start
Completed
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
CTBUH Italy Co-Hosts the 7th Tall Buildings Conference in Milan
7 June 2017 - Event
27 October 2015 | Milan
From New York to Busan: Reflecting Culture in Urban Design
Overpopulation, climate change, aging infrastructure: the threats facing tomorrow’s cities are, in many ways, design problems. The challenges of today’s world have to be solved...
11 June 2013
The Special Nature of the European Skyscraper
Viewpoints: The London Conference
European architecture is at a crossroads. Its commercial and environmental realities are driving buildings ever-higher, but not all are convinced. In this article – contributed...
27 October 2015 | Milan
From New York to Busan: Reflecting Culture in Urban Design
Overpopulation, climate change, aging infrastructure: the threats facing tomorrow’s cities are, in many ways, design problems. The challenges of today’s world have to be solved...
05 February 2010 | Milan
Elegant Efficiency for Complex Tall Towers
In recent years, changes to the design and construction process have given architects, engineers, fabricators and builders the tools to design and build bigger and...
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy