You must be a CTBUH Member to view this resource.
RWE Turm
RWE AG Konzernzentrale, DLZ-Stern-Turm, Power Tower
Building
Completed, 1996
45128
office
127.0 m / 417 ft
31
3
36,000 m² / 387,501 ft²
Construction Start
Completed
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
Christoph Ingenhoven Explains the Necessity for High-Rises
12 June 2013 - Conference Video
12 June 2013 | Essen
Why I am in Love with High-Rises
Christoph Ingenhoven presents his point of view regarding the necessity of high-rises in cities. He discusses a wide range of built projects, including one of...
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy