You must be a CTBUH Member to view this resource.
Shinjuku Center Building
Building
Completed, 1979
office / retail
concrete/steel
222.8 m / 731 ft
54
4
32
183,063 m² / 1,970,474 ft²
You must be a CTBUH Member to view this resource.
You must be a CTBUH Member to view this resource.
Construction Start
Completed
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
03 November 2011 | Tokyo
As tall buildings continue to rise in highly active seismic regions, the importance of designing their structures to withstand these dramatic events and maintain the...
01 September 2016
Hideshi Aono, Osamu Hosozawa, Yozo Shinozaki & Yuichi Kimura, Taisei Corporation
Along the subduction-zone of the western Japanese islands, large earthquakes are expected occur around the middle of this century, and long-period ground motions will reach...
01 September 2016
Along the subduction-zone of the western Japanese islands, large earthquakes are expected occur around the middle of this century, and long-period ground motions will reach...
10 October 2011
Seismic Retrofit of High-Rise Building with Deformation-Dependent Oil Dampers
Along the subduction-zone of the western Japanese islands, large earthquakes will occur around the middle of this century and long-period ground motions will reach major...
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy