You must be a CTBUH Member to view this resource.
Shiodome Sumitomo Building
Building
Completed, 2004
hotel
steel
126.4 m / 415 ft
25
3
240
Construction Start
Completed
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
30 April 2018
Inter-Story Isolation Systems (IIS) for Tall Buildings: Design Considerations
Elena Mele, Diana Faiella, University of Naples Federico II
Inter-story isolation systems (IIS) are currently gaining significant popularity, mainly in Japan, where more than 60 applications have been realized in the past 20 years....
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy