You must be a CTBUH Member to view this resource.
Sky Barcelona
Hotel ME Barcelona, Habitat Sky
Building
Completed, 2008
08005
hotel
composite
115.2 m / 378 ft
31
4
259
183
30,683 m² / 330,269 ft²
Proposed
Construction Start
Completed
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Usually takes on the balance of the architectural effort not executed by the "Design Architect," typically responsible for the construction documents, conforming to local codes, etc. May often be referred to as "Executive," "Associate," or "Local" Architect, however, for consistency CTBUH uses the term "Architect of Record" exclusively.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
Hotel ME was conceived as a building of two slipped masses; a base inserted into the horizontal strata of the city, and an elevated body and crown inserted into the vertical strata of the city. This morphology has created a play of volumes, with the lower building acting as a counterpoint to the projected building above; a rectangular parallelepiped cut lengthwise in two, with one of the halves shifted skywards. This rupture of the “perfect geometric block” creates a movement of form and volume that bestows an urban sense on the insertion of the tower in the horizontal city.
The interior layout and environment of the hotel is based on achieving generous views from each room, with windows acting like giant screens overlooking the city landscape. The envelope of the building is an “armour” of combined glass and inox steel sheets; a protective, unchangeable skin. It is produced from sheets of glass containing stainless steel sheets; a living skin playing with the light—shimmering on one side, shaded on the other, transparent at some points, opaque and closed along the crest, with a saw-tooth finish on the edge of the terraces.
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy