This project is a renovation and replaced King`s Reach Tower
You must be a CTBUH Member to view this resource.
South Bank Tower
Kings Reach Tower
Building
Completed, 2016
SE1
residential
150.4 m / 494 ft
42
1
191
You must be a CTBUH Member to view this resource.
You must be a CTBUH Member to view this resource.
Proposed
Construction Start
Completed
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
20 April 2017
Bioclimatic Comfort Design for High-Rises
Jeroen Janssen, AKT II Ltd.
Building in an ever more urbanized world, with high-rise buildings increasing in both height and number, makes it essential to ensure we create comfortable urban...
20 April 2017
Bioclimatic Comfort Design for High-Rises
Building in an ever more urbanized world, with high-rise buildings increasing in both height and number, makes it essential to ensure we create comfortable urban...
17 October 2016
The Rejuvenation of a Tall Building
The incredibly rapid urbanization observed in many of the larger cities in the world is forcing society, and the construction industry in particular, to think...
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy