You must be a CTBUH Member to view this resource.
The Residences Tower 1
W3 Tower
Building
Completed, 2007
residential
concrete
140.0 m / 459 ft
42
2
Proposed
Construction Start
Completed
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
20 October 2018
Residential High-Rises in Dubai: Typologies, Tendencies and Development Prospects
Elena M. Generalova & Viktor P. Generalov, Samara State Technical University
This study discusses the current typologies of high-rise housing prevalent in Dubai. The uniqueness, trends and prospects of Dubai tall, residential development are analyzed. The...
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy