The Silo
Building
Completed, 2017
2150
residential
concrete
65.0 m / 213 ft
17
1
39
3
10,000 m² / 107,639 ft²
Construction Start
Completed
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
Best Tall Building Europe 2018 Winner
2018 CTBUH Awards
30 May 2018 | Copenhagen
From Grain Silo to Glorious Living
The Silo is a renovation of the largest industrial building in the redeveloped neighborhood of Nordhavn (North Harbor) in Copenhagen, Denmark. It has been transformed...