The Torch
Building
Completed, 2011
residential
concrete
352.0 m / 1,155 ft
86
4
676
686
8
6 m/s
94,306 m² / 1,015,101 ft²
You must be a CTBUH Member to view this resource.
You must be a CTBUH Member to view this resource.
Proposed
Construction Start
Completed
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
CTBUH Leaders Connect at 2017 Conference
29 October 2017 - Event
Top Company Rankings: The World’s 100 Tallest Buildings
13 October 2016 - CTBUH Research
28 April 2016
Debating Tall: Do Cladding Fire Codes & Tests Need Changing?
Phil Barry, CWB Fire Safety Consultants Ltd; Simon Lay, Olsson Fire & Risk UK
A series of high-profile fires in tall buildings in the Middle East has raised concerns about standards for fire protection in exterior cladding on these...
The Torch is a residential skyscraper sited in Dubai’s marina district. Completed in 2011, the building has gone from relative isolation to gaining a host of skyscraping neighbors nearby. The waterfront tower consists of six retail spaces and 676 residential apartments that range in size and offerings, with a host of large duplex penthouses. The location places it amongst Dubai’s most in-demand tall buildings in the marina.
The tower has a concrete column structure, with beam and slab construction and a non-load-bearing façade. The structure was built in three continuous sections, punctuated by intermittent mechanical floors. The shapes and materials that compose the building’s white and unitized blue glass curtain façade vary along its height, offering visual variety. At the top, a sculptural facet crowns the building, a glass-paned element that twists and extends upward, creating a swirl around the tower’s protruding spire, an architectural detail whose form was inspired by the building’s inspiration, a torch. The building’s interiors feature exquisite marble floors in the communal areas such as the lobby, and carefully-laid tile floors in the residences.
The skyscraper is built on a concrete podium structure with patterned walls that are reminiscent of a mashrabiya, a type of projecting window common in Islamic architecture comprising an intricately carved latticework that gives protection from the sun. The podium houses shopping destinations for residents and guests. Modern amenities for residents include a sauna and steam room with private changing rooms, a state-of-the-art gym, and ample private parking space. The podium’s rooftop is landscaped with palm trees, and boasts a large private deck with a swimming pool, Jacuzzi, and a sunbathing area.
28 April 2016
Debating Tall: Do Cladding Fire Codes & Tests Need Changing?
A series of high-profile fires in tall buildings in the Middle East has raised concerns about standards for fire protection in exterior cladding on these...
31 December 2011
Year in Review: Tall Trends of 2011
The annual story is becoming a familiar one: 2007, 2008, 2009, 2010, and now 2011 have each sequentially broke the record for the most 200...
29 October 2017
The Annual Leaders Meeting was held the day before the start of the CTBUH 2017 Australia Conference, bringing together the Council’s leaders.
13 October 2016
The Council is pleased to announce the Top Company Rankings for numerous disciplines as derived from the list of projects appearing in 100 of the World’s Tallest Buildings.
31 December 2011
The annual story is becoming a familiar one: 2007, 2008, 2009, 2010, and now 2011 have each sequentially broke the record for the most 200 meter or higher buildings completed in a given year. Once again, more 200 m+ buildings were completed in 2011 than in any year previous.
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy