You must be a CTBUH Member to view this resource.
The Trump Palm International Hotel & Tower
Building
Never Completed
residential / hotel
270.0 m / 886 ft
62
Proposed
Construction Start
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
05 February 2010 | Dubai
Hybrid Solutions for Tall Buildings
Recent innovations in the design of tall buildings have evolved away from single material solutions, to the optimum design often being a concrete / steel...
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy