You must be a CTBUH Member to view this resource.
Tour Initiale
Tour Nexity, Tour Aventis, PB11, Tour Nobel
Building
Completed, 1966
92800
office
composite
105.0 m / 344 ft
30
4
33,500 m² / 360,591 ft²
Construction Start
Completed
Recladding
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy