You must be a CTBUH Member to view this resource.
Trinity
Trinity Tower
Building
Completed, 2020
office
concrete
BREEAM Excellent; NF HQE Bâtiments Tertiaires Exceptionnel
140.0 m / 459 ft
32
165
49,000 m² / 527,432 ft²
Construction Start
Completed
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
CTBUH France: Global Walking Tour and Chapter Inauguration
10 October 2019 - Event
19 March 2020
Bridging Communities, Building Serendipity
Jean-Luc Crochon, Cro&Co Architecture
The Trinity tower, located in the Paris La Défense business district, is a 32-story, 140-meter tower, whose most outstanding feature is its construction upon a...
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy