You must be a CTBUH Member to view this resource.
U.S. Bank Tower
Library Tower, First Interstate Bank World Center, US Bank Tower
Building
Completed, 1990
90071
office
steel
310.3 m / 1,018 ft
73
2
24
You must be a CTBUH Member to view this resource.
You must be a CTBUH Member to view this resource.
Construction Start
Completed
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Usually takes on the balance of the architectural effort not executed by the "Design Architect," typically responsible for the construction documents, conforming to local codes, etc. May often be referred to as "Executive," "Associate," or "Local" Architect, however, for consistency CTBUH uses the term "Architect of Record" exclusively.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The Engineer of Record takes the balance of the engineering effort not executed by the “Design Engineer,” typically responsible for construction documents, conforming to local codes, etc.
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
Top 12 Happenings of 2016, Month-by-Month
19 December 2016 - CTBUH News
07 November 2013 | Los Angeles
Lynn S. Beedle Lifetime Achievement Award: A Lifetime's Work
Lynn S. Beedle Lifetime Achievement Awardee Henry Cobb's career is remarkable because of his ethical and forward-thinking approach to the design of tall buildings and...
11 June 2014
CTBUH Research
In this installment of Tall Buildings in Numbers, CTBUH considers how helipads are used on skyscrapers, and which are the highest in the world. The...
When built, U.S. Bank Tower was the first supertall building, not just in Los Angeles, but also in the entire western United States to the west of Chicago and Houston. Originally known as Library Tower, it was constructed across the street from the historic Central Library of Los Angeles and was developed utilizing air rights purchased from the city, preserving the historic open setting of the low-rise building. Its Art-Deco-via-Post-Modern design took cues from established local icons of the 1920s, including City Hall and the Central Library. It is also notable for the public-realm improvements at its base, which is built into a hill. A cascading set of waterfalls and stairs descends around the perimeter.
When built, U.S. Bank Tower was the tallest structure to be located in a seismically active area. Designers based the layout of the tower plan on a concept of overlapping geometries, a circular form superimposed onto a rectilinear matrix, a shape that is translated to the outside of the building and extruded upward into a series of upper level setbacks and a textured façade made up of triangular window bays. The triangular bays are repeated in the crown with more pronounced angles providing greater visual distinction between it and the tower below.
At ground level, development of the tower incorporated the creation of the Bunker Hill steps, a pedestrian link ascending the topographical change between the modern downtown towers built in the Bunker Hill area primarily in the mid to late 20th century and the shorter early 20th century buildings of the historic downtown core.
U.S. Bank Tower has dominated the Los Angeles skyline as its tallest building for 27 years, and has been seen in the backdrop of numerous films produced by Hollywood studios. Its presence will remain a key feature of the skyline, even as its title of the city’s tallest has since passed on to Wilshire Grand Center and as other changes occur to downtown Los Angeles in the in the years to come.
When completed, it was the world's tallest building in a seismic zone.
Features a 45 ft (13.7 m) slide that hangs off the side off the building 1,000 ft (304.8 m) above ground.
First building to be destroyed by aliens in the 1996 movie "Independence Day."
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy