You must be a CTBUH Member to view this resource.
W350 Tower
Building
Vision
residential / hotel / office / retail
composite
350.0 m / 1,148 ft
70
455,000 m² / 4,897,579 ft²
Proposed
Construction Start
Completed
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Timber is expected to make up 90 per cent of the hybrid structure, with 185,000 cubic meters of wood planned to be used in its construction.
The building would use a "braced tube structure" with columns and beams made from steel and timber, supplemented by additional diagonal steel braces.
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy