Filter by
You must be a CTBUH Member to view this resource.
Zhengzhou Greenland Plaza
Millenium Royal Plaza
Building
Completed, 2014
hotel / office
composite
280.0 m / 919 ft
56
416
203
22
240,169 m² / 2,585,158 ft²
You must be a CTBUH Member to view this resource.
You must be a CTBUH Member to view this resource.
Proposed
Construction Start
Completed
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Usually takes on the balance of the architectural effort not executed by the "Design Architect," typically responsible for the construction documents, conforming to local codes, etc. May often be referred to as "Executive," "Associate," or "Local" Architect, however, for consistency CTBUH uses the term "Architect of Record" exclusively.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The CTBUH lists a project manager when a specific firm has been commissioned to oversee this aspect of a tall building’s design/construction. When the project management efforts are handled by the developer, main contract, or architect, this field will be omitted.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Usually takes on the balance of the architectural effort not executed by the "Design Architect," typically responsible for the construction documents, conforming to local codes, etc. May often be referred to as "Executive," "Associate," or "Local" Architect, however, for consistency CTBUH uses the term "Architect of Record" exclusively.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The CTBUH lists a project manager when a specific firm has been commissioned to oversee this aspect of a tall building’s design/construction. When the project management efforts are handled by the developer, main contract, or architect, this field will be omitted.
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
CITAB-CTBUH Name 2016 China Tall Building Award Recipients
25 February 2016 - CTBUH News
CTBUH Releases Year in Review: Tall Trends of 2012
31 December 2012 - CTBUH Journal
31 December 2012
Year in Review: Tall Trends of 2012
Kevin Brass, Antony Wood & Marty Carver, CTBUH
For the first time in six years the number of tall buildings completed annually around the world declined as the effects of the global financial...
The Greenland Plaza tower is instantly recognizable for its sophisticated three- to five-story-tall light-gauge painted aluminum screens. Configured at an outward cant that enhances interior daylighting through scientifically calculated reflections, the screens protect the all-glass exterior from solar gain. The rhythmic cant of the screens, combined with their decreasing size as they rise on the building, creates a dynamic movement that gives the building a fine-grained texture.
The entire experience of the tower is suffused with gradations of light. At the tower’s entrance, the circular ground-floor office lobby features floor-to-ceiling windows, offering views of the gardens and the lake beyond. At the 36th floor, the hotel lobby anchors an 18-story atrium; natural light permeates throughout. Above the observation deck, the heliostat – a digitally shaped solar reflector – focuses sunlight into the atrium. Through an intensive series of daylighting studies, the device was specifically designed to maximize the amount of natural light entering the building.
31 December 2012
Year in Review: Tall Trends of 2012
For the first time in six years the number of tall buildings completed annually around the world declined as the effects of the global financial...
23 September 2012
Case Study: Greenland's Suzhou Center, Wujiang
At 358 meters, Greenland Group Suzhou Center marks the Wujiang waterfront with an aerodynamic form that has a unique presence, while accommodating its program with...
25 February 2016
CITAB and CTBUH are pleased to announce the award recipients for the inaugural CITAB-CTBUH 2016 China Tall Building Awards.
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy