d`Leedon

Singapore
Official Name
The current legal building name.

d`Leedon

Type

Complex

Status
Completed
Architecturally Topped Out
Structurally Topped Out
Under Construction
Proposed
On Hold
Never Completed
Vision
Competition Entry
Canceled
Proposed Renovation
Under Renovation
Renovated
Under Demolition
Demolished

Completed

Country

Singapore

City

Singapore

Function

residential

Master Planner

Zaha Hadid Architects

# of Apartments

1,703

# of Parking Spaces

1,866

Development GFA
Development GFA refers to the total gross floor area within the entire development in which a tower exists, and may therefore be at times the total sum of several towers and related low-rise buildings.

218,519 m² / 2,352,119 ft²

Map of Buildings in Complex

Note: Only buildings that have GPS coordinates recorded are displayed.

 

List of Buildings in Complex

Rank
Building Name
Status
Completed
Architecturally Topped Out
Structurally Topped Out
Under Construction
Proposed
On Hold
Never Completed
Vision
Competition Entry
Canceled
Proposed Renovation
Under Renovation
Renovated
Under Demolition
Demolished
Completion
Height
Floors
Material
Use
1 d'Leedon 05
2014 137.5 m / 451 ft 36 concrete residential
1 d'Leedon 09
2014 137.5 m / 451 ft 36 concrete residential
1 d'Leedon 15
2014 137.5 m / 451 ft 36 concrete residential
4 d'Leedon 03
2014 137 m / 449 ft 36 concrete residential
5 d'Leedon 07
2014 134.7 m / 442 ft 35 concrete residential
6 d'Leedon 11
2014 125.6 m / 412 ft 35 concrete residential
7 d'Leedon 13
2014 123.7 m / 406 ft 35 concrete residential

CTBUH Awards & Distinctions

Urban Habitat Award 2015 Award of Excellence

2015 CTBUH Awards

Research

28 October 2019

After Machine-À-Habiter

Paolo Zilli, Zaha Hadid Architects

The technological component in architecture has dramatically increased during the last 50 years. Buildings react automatically to various inputs and the machine-à-habiter—a main concept of...