You must be a CTBUH Member to view this resource.
The Palm Gateway
Complex
Under Construction
residential
1,262
Note: Only buildings that have GPS coordinates recorded are displayed.
Rank
|
Building Name
|
Status
Completed
Architecturally Topped Out
Structurally Topped Out
Under Construction
Proposed
On Hold
Never Completed
Vision
Competition Entry
Canceled
Proposed Renovation
Under Renovation
Renovated
Under Demolition
Demolished
|
Completion
|
Height
|
Floors
|
Material
|
Use
|
---|---|---|---|---|---|---|---|
1 | Tubular Tower | 2021 | 285 m / 935 ft | 61 | concrete | residential | |
2 | Central Tower | 2021 | 211 m / 692 ft | 49 | concrete | residential | |
3 | Beach Tower | 2021 | 205 m / 673 ft | 48 | concrete | residential |
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy