You must be a CTBUH Member to view this resource.
Ostankino Tower
Tower
Completed, 1967
127427
telecommunications / observation
concrete
540.0 m / 1,772 ft
7
8.05 m/s
Construction Start
Completed
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
Height: The History of Measuring Tall Buildings
16 December 2009 - CTBUH News
01 June 2012
A New Leader for Telecom Towers
CTBUH Research
With the recent completion of two megatall telecommunication/observation towers it is perhaps time to review these structures and also explain why they are distinguished from...
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy