You must be a CTBUH Member to view this resource.
Crystal Laputa Tower 3
Building
Completed, 2017
Luxelakes Eco-City, Section, 1, Tianfu Ave
464333
residential
concrete
112.3 m / 368 ft
30
64
22,000 m² / 236,806 ft²
Proposed
Construction Start
Completed
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
Best Tall Building 100-199 meters 2019 Award of Excellence
2019 CTBUH Awards
CTBUH 2019 Award of Excellence Winners Announced
5 December 2018 - Awards
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy