You must be a CTBUH Member to view this resource.
Deutsche Börse Cube
Building
Completed, 2010
65760
office
composite
LEED Platinum
87.4 m / 287 ft
23
3
880
12
80,000 m² / 861,113 ft²
Proposed
Construction Start
Completed
The Peer Review Engineer traditionally comments on the information produced by another party, and to render second opinions, but not to initiate what the design looks like from the start.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
These are firms that consult on the design of a building's façade. May often be referred to as "Cladding," "Envelope," "Exterior Wall," or "Curtain Wall" Consultant, however, for consistency CTBUH uses the term "Façade Consultant" exclusively.
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The Peer Review Engineer traditionally comments on the information produced by another party, and to render second opinions, but not to initiate what the design looks like from the start.
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
These are firms that consult on the design of a building's façade. May often be referred to as "Cladding," "Envelope," "Exterior Wall," or "Curtain Wall" Consultant, however, for consistency CTBUH uses the term "Façade Consultant" exclusively.
A large entrance hall and atrium nearly 83 meters (270 feet) high lies at the heart of this building. This “open architecture” concept makes it possible to see what people are doing in their daily jobs and creates a wide range of opportunities for the creative exchange of ideas and information. The atrium links the two L-shaped high-rises in plan, which face each other. With its connecting walkways, conference boxes, glass elevators, staircases, and bridges, the atrium is the identity-defining space in the new headquarters. All the office units look out not only outdoors, but also on this central hall.
Primary energy consumption is below 150 kWh/m2 annually, achieved by such means as two in-house bio-gas combined heat and power plants (which cover 60% of electricity requirements and the bulk of the building’s heating requirements), a high-efficiency heat recovery system, and intelligent building automation for sun protection and lighting.
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy