521
Global
Height rank

Evolution Tower

Moscow
Height 246.0 m / 807 ft
Floors 55
Official Name
The current legal building name.

Evolution Tower

Other Names
Other names the building has commonly been known as, including former names, common informal names, local names, etc.

City Palace Tower, Wedding Palace

Type
CTBUH collects data on two major types of tall structures: 'Buildings' and 'Telecommunications / Observation Towers.' A 'Building' is a structure where at least 50% of the height is occupied by usable floor area. A 'Telecommunications / Observation Tower' is a structure where less than 50% of the structure's height is occupied by usable floor area. Only 'Buildings' are eligible for the CTBUH 'Tallest Buildings' lists.

Building

Status
Completed
Architecturally Topped Out
Structurally Topped Out
Under Construction
Proposed
On Hold
Never Completed
Vision
Competition Entry
Canceled
Proposed Renovation
Under Renovation
Renovated
Under Demolition
Demolished

Completed, 2015

Country
The CTBUH follows the United Nations's definition of Country, and thus uses the lists and codes established by that organization.

Russia

City
The CTBUH follows the United Nations's definition of City, and thus uses the lists and codes established by that organization.

Moscow

Postal Code

123317

Function
A single-function tall building is defined as one where 85% or more of its usable floor area is dedicated to a single usage. Thus a building with 90% office floor area would be said to be an "office" building, irrespective of other minor functions it may also contain.

A mixed-use tall building contains two or more functions (or uses), where each of the functions occupy a significant proportion of the tower's total space. Support areas such as car parks and mechanical plant space do not constitute mixed-use functions. Functions are denoted on CTBUH "Tallest Building" lists in descending order, e.g., "hotel/office" indicates hotel function above office function.

office

Structural Material
Steel
Both the main vertical/lateral structural elements and the floor spanning systems are constructed from steel. Note that a building of steel construction with a floor system of concrete planks or concrete slab on top of steel beams is still considered a “steel” structure as the concrete elements are not acting as the primary structure.

Reinforced Concrete
Both the main vertical/lateral structural elements and the floor spanning systems are constructed from concrete which has been cast in place and utilizes steel reinforcement bars.

Precast Concrete
Both the main vertical/lateral structural elements and the floor spanning system are constructed from steel reinforced concrete which has been precast as individual components and assembled together on-site.

Mixed-Structure
Utilizes distinct systems (e.g. steel, concrete, timber), one on top of the other. For example, a steel/concrete indicates a steel structural system located on top of a concrete structural system, with the opposite true of concrete/steel.

Composite
A combination of materials (e.g. steel, concrete, timber) are used together in the main structural elements. Examples include buildings which utilize: steel columns with a floor system of reinforced concrete beams; a steel frame system with a concrete core; concrete-encased steel columns; concrete-filled steel tubes; etc. Where known, the CTBUH database breaks out the materials used in a composite building’s core, columns, and floor spanning separately.

concrete

Official Website

Evolution Tower

Height
Architectural
Height is measured from the level of the lowest, significant, open-air, pedestrian entrance to the architectural top of the building, including spires, but not including antennae, signage, flag poles or other functional-technical equipment. This measurement is the most widely utilized and is employed to define the Council on Tall Buildings and Urban Habitat (CTBUH) rankings of the "World's Tallest Buildings."

246.0 m / 807 ft

To Tip
Height is measured from the level of the lowest, significant, open-air, pedestrian entrance to the highest point of the building, irrespective of material or function of the highest element (i.e., including antennae, flagpoles, signage and other functional-technical equipment).
246.0 m / 807 ft
Occupied
Height is measured from the level of the lowest, significant, open-air, pedestrian entrance to the highest occupied floor within the building.
220.0 m / 722 ft
Observatory
224.3 m / 736 ft
Helipad
Height, measured from the level of the lowest, significant, open-air, pedestrian entrance, to the building's helipad.
233.7 m / 767 ft
Floors Above Ground
The number of floors above ground should include the ground floor level and be the number of main floors above ground, including any significant mezzanine floors and major mechanical plant floors. Mechanical mezzanines should not be included if they have a significantly smaller floor area than the major floors below. Similarly, mechanical penthouses or plant rooms protruding above the general roof area should not be counted. Note: CTBUH floor counts may differ from published accounts, as it is common in some regions of the world for certain floor levels not to be included (e.g., the level 4, 14, 24, etc. in Hong Kong).

55

Floors Below Ground
The number of floors below ground should include all major floors located below the ground floor level.

3

# of Parking Spaces
Number of Parking Spaces refers to the total number of car parking spaces contained within a particular building.

1292

# of Elevators
Number of Elevators refers to the total number of elevator cars (not shafts) contained within a particular building (including public, private and freight elevators).

17

Top Elevator Speed
Top Elevator Speed refers to the top speed capable of being achieved by an elevator within a particular building, measured in meters per second.

7 m/s

Tower GFA
Tower GFA refers to the total gross floor area within the tower footprint, not including adjoining podiums, connected buildings or other towers within the development.

82,000 m² / 882,641 ft²

Rankings
#
521
Tallest in the World
#
20
Tallest in Europe
#
11
Tallest in Russia
#
10
Tallest in Moscow
#
215
Tallest Office Building in the World
#
8
Tallest Office Building in Europe
#
3
Tallest Office Building in Russia
#
2
Tallest Office Building in Moscow
#
231
Tallest Concrete Building in the World
#
14
Tallest Concrete Building in Europe
#
8
Tallest Concrete Building in Russia
#
8
Tallest Concrete Building in Moscow
Construction Schedule
2005

Proposed

2008

Construction Start

2015

Completed

Architect
Design

Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.

Structural Engineer
Engineer of Record

The Engineer of Record takes the balance of the engineering effort not executed by the “Design Engineer,” typically responsible for construction documents, conforming to local codes, etc.

MEP Engineer
Design

The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.

Engineer of Record

The Engineer of Record takes the balance of the engineering effort not executed by the “Design Engineer,” typically responsible for construction documents, conforming to local codes, etc.

Main Contractor

The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.

Other Consultant

Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).

Façade

These are firms that consult on the design of a building's façade. May often be referred to as "Cladding," "Envelope," "Exterior Wall," or "Curtain Wall" Consultant, however, for consistency CTBUH uses the term "Façade Consultant" exclusively.

Material Supplier

Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).

Sealants
Owner
City-Palace LLC; ZAO Snegiri Development; Transneft
Developer
ZAO Snegiri Development
Architect
Design

Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.

Structural Engineer
Design

The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.

GK-Techstroy
Engineer of Record

The Engineer of Record takes the balance of the engineering effort not executed by the “Design Engineer,” typically responsible for construction documents, conforming to local codes, etc.

MEP Engineer
Design

The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.

Engineer of Record

The Engineer of Record takes the balance of the engineering effort not executed by the “Design Engineer,” typically responsible for construction documents, conforming to local codes, etc.

Main Contractor

The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.

Other Consultant

Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).

Façade

These are firms that consult on the design of a building's façade. May often be referred to as "Cladding," "Envelope," "Exterior Wall," or "Curtain Wall" Consultant, however, for consistency CTBUH uses the term "Façade Consultant" exclusively.

United Façade Company; VELKO-2000; ST-Facades; Technologica; Permasteelisa Group
Façade Maintenance
Atechbcn
Fire
OPB
Lighting
L-Cube
Material Supplier

Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).

Cladding
Guardian Glass; VELKO-2000
Elevator
thyssenkrupp
Façade Maintenance Equipment
Atechbcn
Formwork
Peri Group
Sealants

CTBUH Awards & Distinctions

Best Tall Building Europe 2015 Award of Excellence

2015 CTBUH Awards

CTBUH Initiatives

CTBUH Supports High-Rise Conference at Samara State University

4 September 2017 - Event

Twisting Tall Buildings

18 August 2016 - CTBUH Research

Videos

12 November 2015 | Moscow

2015 Awards - Session 1 Q&A

Hiroo Mori, Director & Executive VP, Mori Building, Philip Nikandrov, Chief Architect, Gorproject, James Goettsch, CEO & Partner, Goettsch Partners, Jan Andersson, Senior Advisor, HSB...

Research

01 August 2016

Upward Spiral: The Story of the Evolution Tower

Philip Nikandrov, GORPROJECT

The Evolution Tower, Moscow, set off a wave of imitators when its design was first revealed in 2004, but it took another 12 years for...

12 November 2015 | Moscow

2015 Awards - Session 1 Q&A

Hiroo Mori, Director & Executive VP, Mori Building, Philip Nikandrov, Chief Architect, Gorproject, James Goettsch, CEO & Partner, Goettsch Partners, Jan Andersson, Senior Advisor, HSB...

12 November 2015 | Moscow

Evolving Russian Tall Building Typologies: Evolution Tower, Moscow

Philip Nikandrov, Chief Architect, Gorproject, speaks at the 14th Annual Best Tall Building Symposium in a presentation entitled "Evolving Russian Tall Building Typologies: Evolution Tower,...

12 November 2015 | Moscow

Interview: Evolution Tower

Philip Nikandrov, Chief Architect, Gorproject, is interviewed by Chris Bentley regarding the Best Tall Building Featured Finalist, the Evolution Tower, Moscow, during the 2015 CTBUH...

7 September 2017

CTBUH Supports High-Rise Conference at Samara State University

22 speakers discussed the state of high-rise design & construction at this conference, a partner event between the CTBUH and Samara State Technical University.

18 August 2016

Twisting Tall Buildings

CTBUH has released a study that looks at the recent proliferation of twisting towers creating a new generation of iconic buildings throughout the world.