Filter by
You must be a CTBUH Member to view this resource.
Grattacielo Intesa Sanpaolo
Building
Completed, 2015
10138
office
composite
LEED Platinum Italia
166.3 m / 545 ft
38
6
338
25
6 m/s
110,000 m² / 1,184,030 ft²
You must be a CTBUH Member to view this resource.
You must be a CTBUH Member to view this resource.
Construction Start
Completed
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
These are firms that consult on the design of a building's façade. May often be referred to as "Cladding," "Envelope," "Exterior Wall," or "Curtain Wall" Consultant, however, for consistency CTBUH uses the term "Façade Consultant" exclusively.
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The CTBUH lists a project manager when a specific firm has been commissioned to oversee this aspect of a tall building’s design/construction. When the project management efforts are handled by the developer, main contract, or architect, this field will be omitted.
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
These are firms that consult on the design of a building's façade. May often be referred to as "Cladding," "Envelope," "Exterior Wall," or "Curtain Wall" Consultant, however, for consistency CTBUH uses the term "Façade Consultant" exclusively.
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
Best Tall Building Europe 2016 Award of Excellence
2016 CTBUH Awards
CTBUH Italy Co-Hosts the 7th Tall Buildings Conference in Milan
7 June 2017 - Event
CTBUH Names Tall Building Award Winners and Finalists
22 June 2016 - Awards
26 October 2015
Recent Developments in Tall Buildings in Italy
Franco Mola, Laura Maria Pellegrini, Giuseppe Galassi & Elena Mola, ECSDSconocchia
Major designs by internationally renowned architects, are currently under construction in Italy in the cities of Milan and Turin. In the decade 2005-2015, a dramatic...
7 June 2017
CTBUH Italy co-hosted the seventh edition of the one-day International Tall Buildings Conference held in Milan, which focused on various challenges of tall buildings.
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy