You must be a CTBUH Member to view this resource.
J.W. Marriott and The Upper House
Building
Completed, 1988
hotel
164.5 m / 540 ft
50
719
You must be a CTBUH Member to view this resource.
You must be a CTBUH Member to view this resource.
Construction Start
Completed
Retrofit End
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
17 October 2016
Shifting Urban Gravity, from “Central” To “Core” Business Districts
Tim Balckburn, Swire Properties
In the age of the multi-million inhabitant city, the traditional concept of a single Central Business District (CBD) is becoming increasingly unrealistic. As we are...
Constructed at the base of a hill sloping upward from Victoria Harbour, the Pacific Place Complex sits adjacent to Hong Kong Park, both of which were constructed on the site of the Victoria Barracks operated by the British Military. While the western portion of the barracks became public a green space interspersed with a collection of preserved low-rise structures from Hong Kong’s colonial era, the eastern portion gave way to the Pacific Place development. After the land was transferred from the Government of Hong Kong in the mid 1980’s, construction began quickly with Phase 1 opening in 1988.
Phase 1 included One Pacific Place as the as the J.W. Marriott and The Upper House which was originally constructed as a mixed use residential and hotel tower with 140 serviced apartments above 607 hotel rooms. As part of a later interior retrofit, the uppermost floors were converted from residential into the suites of the 117 key Upper House Hotel which opened in 2009. Combined with the JW Marriott hotel below, there are presently 719 rooms as well as a handful of restaurants spread throughout the tower.
The tower is perched on a hillside podium comprised of the three story Pacific Place shopping mall and a landscaped rooftop serving a courtyard between the towers of the complex as well as the publicly accessible street linking the main entrances of each building. The J.W. Marriott and The Upper House features a glass façade composed of triangular window bays maximizing views of the surrounding harbour, hilltops and skyline which has grown up around it since completion.
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy