2357
Global
Height rank

SK HUB Sky Tower 2

Busan
Height 182.0 m / 597 ft
Floors 49
Official Name
The current legal building name.

SK HUB Sky Tower 2

Name of Complex
A complex is a group of buildings which are designed and built as pieces of a greater development.

HUB sky

Type
CTBUH collects data on two major types of tall structures: 'Buildings' and 'Telecommunications / Observation Towers.' A 'Building' is a structure where at least 50% of the height is occupied by usable floor area. A 'Telecommunications / Observation Tower' is a structure where less than 50% of the structure's height is occupied by usable floor area. Only 'Buildings' are eligible for the CTBUH 'Tallest Buildings' lists.

Building

Status
Completed
Architecturally Topped Out
Structurally Topped Out
Under Construction
Proposed
On Hold
Never Completed
Vision
Competition Entry
Canceled
Proposed Renovation
Under Renovation
Renovated
Under Demolition
Demolished

Completed, 2006

Country
The CTBUH follows the United Nations's definition of Country, and thus uses the lists and codes established by that organization.

South Korea

City
The CTBUH follows the United Nations's definition of City, and thus uses the lists and codes established by that organization.

Busan

Address

Oncheonjang-ro

Function
A single-function tall building is defined as one where 85% or more of its usable floor area is dedicated to a single usage. Thus a building with 90% office floor area would be said to be an "office" building, irrespective of other minor functions it may also contain.

A mixed-use tall building contains two or more functions (or uses), where each of the functions occupy a significant proportion of the tower's total space. Support areas such as car parks and mechanical plant space do not constitute mixed-use functions. Functions are denoted on CTBUH "Tallest Building" lists in descending order, e.g., "hotel/office" indicates hotel function above office function.

residential

Height
Architectural
Height is measured from the level of the lowest, significant, open-air, pedestrian entrance to the architectural top of the building, including spires, but not including antennae, signage, flag poles or other functional-technical equipment. This measurement is the most widely utilized and is employed to define the Council on Tall Buildings and Urban Habitat (CTBUH) rankings of the "World's Tallest Buildings."

182.0 m / 597 ft

To Tip
Height is measured from the level of the lowest, significant, open-air, pedestrian entrance to the highest point of the building, irrespective of material or function of the highest element (i.e., including antennae, flagpoles, signage and other functional-technical equipment).
182.0 m / 597 ft
Helipad
Height, measured from the level of the lowest, significant, open-air, pedestrian entrance, to the building's helipad.
182.0 m / 597 ft
Floors Above Ground
The number of floors above ground should include the ground floor level and be the number of main floors above ground, including any significant mezzanine floors and major mechanical plant floors. Mechanical mezzanines should not be included if they have a significantly smaller floor area than the major floors below. Similarly, mechanical penthouses or plant rooms protruding above the general roof area should not be counted. Note: CTBUH floor counts may differ from published accounts, as it is common in some regions of the world for certain floor levels not to be included (e.g., the level 4, 14, 24, etc. in Hong Kong).

49

Rankings
#
2357
Tallest in the World
#
101
Tallest in South Korea
#
26
Tallest in Busan
#
662
Tallest Residential Building in the World
#
425
Tallest Residential Building in Asia
#
78
Tallest Residential Building in South Korea
#
23
Tallest Residential Building in Busan
#
2357
Tallest Building in the World
#
101
Tallest Building in South Korea
#
26
Tallest Building in Busan
Construction Schedule
2003

Construction Start

2006

Completed

Project Manager

The CTBUH lists a project manager when a specific firm has been commissioned to oversee this aspect of a tall building’s design/construction. When the project management efforts are handled by the developer, main contract, or architect, this field will be omitted.

Parsons Brinckerhoff Consultants Private Limited