You must be a CTBUH Member to view this resource.
The Tower at PNC Plaza
4 PNC Plaza
Building
Completed, 2015
15212
office
composite
LEED Platinum
166.0 m / 544 ft
33
3
130
16
6 m/s
56,485 m² / 607,999 ft²
You must be a CTBUH Member to view this resource.
You must be a CTBUH Member to view this resource.
Proposed
Construction Start
Completed
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
These are firms that consult on the design of a building's façade. May often be referred to as "Cladding," "Envelope," "Exterior Wall," or "Curtain Wall" Consultant, however, for consistency CTBUH uses the term "Façade Consultant" exclusively.
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
These are firms that consult on the design of a building's façade. May often be referred to as "Cladding," "Envelope," "Exterior Wall," or "Curtain Wall" Consultant, however, for consistency CTBUH uses the term "Façade Consultant" exclusively.
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
Best Tall Building Americas 2016 Award of Excellence
2016 CTBUH Awards
CTBUH Names Tall Building Award Winners and Finalists
22 June 2016 - Awards
17 October 2016
Sustainable Integration of Tall Buildings and the Urban Habitat for the Megacities of the Future
Mark Lavery, BuroHappold Engineering
Tall buildings increasingly dominate our skylines as an almost inevitable response to urbanisation. They often do not integrate well with the urban habitat in which...
17 October 2016
Sustainable Integration of Tall Buildings and the Urban Habitat for the Megacities of the Future
Tall buildings increasingly dominate our skylines as an almost inevitable response to urbanisation. They often do not integrate well with the urban habitat in which...
28 April 2016
Designing a Data-Driven, Humanistic High-Rise
Much attention has been given to how data and “the cloud” will revolutionize the workplace. Indeed, the way we work is rapidly changing, though many...
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy